Things tagged '2017-18'

limited to the area of Cyclewight:

2 issues found for '2017-18':

  • Festing Rd / Albert Road Crossing LTP3 2017/18

    Ian S // 1 thread

    Albert Road / Festing Road Junction -

    Following several pedestrian casualties at this junction (recent 3 year period 01/07/13 to 30/06/16 shows a total of 4 collisions (3 serious) with 3 being pedestrians and 1 pedal cycle) improvements can be implemented to assist with the uncontrolled crossing.

    These could include building out of existing kerb lines to reduce vehicle speeds entering/exiting the junction, extending the pedestrian island in length and implementing guard railing outside of the public house entrances to guide pedestrians to crossing facilities.

    Please sign in to vote.
  • Cromwell / Highland / Milton / Henderson Rd RBT - LTP3 2017/18

    Ian S // 1 thread

    Cromwell Rd/Henderson Rd Roundabout has previously experienced a high level of cycle casualties.

    This scheme is designed to build-out existing kerb lines and central island to create deflection, reducing approach speeds and segregate the bus lane.

    Surfacing and lining could also be utilised to highlight to drivers the likelihood of cyclists on the roundabout, and consideration will be given to the implementation of a segregated cycle lane.

    Please sign in to vote.

10 threads found for '2017-18':

No library items found for '2017-18'.

No planning applications found for '2017-18'.

Back to top